Wind Installations - 6kw Turbine at Astley Cooper School
Installed cost: £22,805.48 @ 17.5% VAT
Installed cost after grant: £11,402.74
For more info on grants and how to obtain one click here
Estimated KWh (Units) produced per annum: 11,662 @ windspeed of 5m/s

Astley Cooper School has decided to install a 6kw Proven turbine to supplement their energy needs.

Here is the turbine on a 15m mast, placed at the corner of the school playing field.
The turbine from below, you can see Proven's unique furling system.

Our engineer, Chris, applying the finishing touches to the inverters and isolators.

Here you can see we have used two 3kw inverters at the top, the AC and DC isolators are below.

The fully installed 6kw Proven turbine from a distance.